Case Study – Infill 30,000 m3 Void

Engineer in front of an excavator

Former sand quarry: Earthworks operations to use predominately site won material to backfill an existing former sand quarry. Summary T&P Regeneration was approached by a national house building client who needed to find a cost-effective method of filling an approximate 30,000m3 void present on site to a standard that would be suitable for the construction…

Read More